Getting bulk material from the pile to where it needs to go

This is where most people underestimate the work. A bad wheelbarrow or the wrong shovel will wear you out before the job is half done.

What to put down before you pour gravel

Skipping landscape fabric is the most common mistake on gravel projects. Weeds push through in year two and you end up re-doing the whole thing.

The rule of thumb: For decorative gravel and paths, 3 oz/sq yd fabric is fine. For driveways and high-traffic areas, go 4โ€“5 oz. Anything lighter is a waste of money โ€” it won't last under the weight.

Getting an even, level surface

Bulk material delivery drops it in a pile. Getting it level is a separate job โ€” the right rake makes it go much faster.

Making sure gravel actually stays put

Loose gravel on a driveway or path shifts under foot and tire traffic. Compaction is what turns a soft, shifting surface into a firm one.

When you need a plate compactor vs. a hand tamper: Hand tampers are fine for small areas (under ~200 sq ft) and base prep in tight spots. For anything larger โ€” especially driveways โ€” rent a plate compactor. The rental is usually $60โ€“$80/day and it does in an hour what takes half a day by hand.

Keeping gravel where it belongs

Without edging, gravel migrates into the lawn within a season. It's one of the cheaper parts of any project and one of the most worthwhile.

French drains and dry creek beds

Drainage work almost always involves gravel โ€” usually #57 stone wrapped in filter fabric inside a perforated pipe. Here's what you need beyond the gravel itself.

The basic French drain setup: Dig a trench (12" wide ร— 18โ€“24" deep), line with filter fabric, add a bed of #57 stone, lay perforated pipe with holes down, cover with more #57 stone, fold fabric over the top, backfill. The fabric keeps soil out of the gravel so it doesn't clog over time.

The basics people skip and regret

Bulk material work is hard on your hands, back, and eyes. These aren't exciting but they matter.